15/10/2018
The Project Modification Procedure was revised following the decision of the JMC on 05/10/2018.
The revision concerned the change on the budget that will be used as a reference for the calculation of the percentage (%) of the budget reallocation.
All related documents have been uploaded at the “Library” section of the website.